PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing Metal deck angles at Elev. 4,5 (3rd Floor) Facing South East (800x600).jpg Metal Deck angles at Elev. 4,5 (3rd Floor) Facing East (800x600).jpg Metal Deck angles at Elev. 4-Stair -2 (3rd Floor) Facing South (800x600).jpg Metal Deck angles at Elev. 4-Stair -4 Facing South (800x600).jpg Bolted Column at Derrick -2 Facing South-East (800x600).jpg Installing rebar mats at Elev. 7-Stair -4,5 (2nd Floor) Facing North-East (800x600).jpg
Previous pageNext page Bolted Column at Derrick -2 Facing South-East (800x600)
Bolted Column at Derrick -2 Facing South-East (800x600)